600 ton Siempelkamp Hydraulic Press
Specifications
- Table 2,800 mm x 1800 mm
- cushion 2 x 150 ton
- stroke 1000 mm
- retrofitted with CNC
“Investment Opportunity—Turnkey forging and CNC machining plant with trained and
assembled workforce available for acquisition or joint venture.”
The press was originally serial no. 4995 and was built for Sumitomo Heavy Industries and later owned by International Crankshaft in Georgetown, KY. ICI traded the press in for a new 7000 ton in 2000. Since then, the press components have been stored inside the Ajax building. Some were sold as used components and these will be replaced with new parts in the rebuilt machine.
These presses have been totally rebuilt under the supervision of Verson engineers. They have all new Allen Bradley PLC controls. They are equivalent to new presses.The presses are erected and under power in their plant in Chicago.
P.A.S – CUT TO LENGTH & SLITTING LINE – 480 AMPS – 3 PHASE COIL CART
UN-COILER McKay Un-coiler (No Serial Number) with 20 ton hydraulic coil cart Un-coiler is Cone Shaped to handle various ID coils Un-coiler (as installed) has a 68” max OD coil capacity Un-coiler 72 inch max width coil capacity Un-coiler has 40,000# max coil weight PEELER TABLE Peeler Table w/coil guide 72” x 118” FLATNER MESTA Flatner – (No Serial Number) 96” wide rollers Flatner – 8 rollers on top – 9 on the bottom – Plus Feeder Rolls SHEER NIAGRA 8 Foot Hydraulic Shear – 3/16 capacity (No Serial Number) 12 foot adjustable height hydraulic roller conveyor SLITTER BRADBURY – 8 inch arbor – 72 inch wide slitter – (.025 thru .125) PLATFORM OPERATORS Steel Platform – 6 feet x 30 feet AIR COMPRESSOR – AIR DRYER AIR COMPRESSOR – 5 H.P. Speedaire AIR DRYER – Wilkerson ELECTRICAL Quantum III Digital DC Drive
The 130 ton EAF/electric arc furnace was built by FUCHS in Germany circa 1995-97. It is a DC (2 electrodes) shaft type furnace. It operates with two 40 MVA transformers working together, and has 1 new spare. It is part of a melt shop near
There is a new spare transformer and a new pin-bottom for the furnace.